Official New Hampshire government website logo
New Hampshire DOT logo Welcome logo
511 INFO

 



Traveler's Alert

Weather Conditions
Travel Planning
Traveler's Alert
Weather Conditions
Travel Planning

VisitNH.com



Construction & Maintenance Activities
Move your cursor over the map icons to view details of each incident.

Roadwork
road closed on New Hampshire 12 at Vilas Bridge because of bridge maintenance work — last updated April 2
roadway reduced to one lane, width limit in effect, sidewalk closed on New Hampshire 1A in both directions between Eisenower Street and Hampton Beach State Park Road due to bridge construction work — until July 17, 2011 last updated December 10
road closed intermittently on New Hampshire 125 in both directions from NH 16 to NH 16 because of construction work — starting 8:00 AM, 02/17/10 until February 17 last updated February 5
bridge construction, major road construction on New Hampshire 16 at NH 125 — until October 15 last updated April 30
roadway reduced to one lane, width limit in effect on Interstate 93 in both directions between Industrial Park Road and Exit 42: US 302 because of road maintenance activities — until February 16 last updated December 22
major road construction on New Hampshire 16 at US 202; Spaulding Turnpike — until October 14, 2011 last updated November 19
long term road construction on New Hampshire 16 from US 202; Chestnut Hill Connector to Cross Road — until October 5, 2012 last updated September 10
roadway reduced to one lane, single line traffic - alternating directions on New Hampshire 111 in both directions from MP 17.286 to MP 17.754 because of construction work — starting 7:00 PM, 02/09/10 until Wednesday, at about 6:00 AM last updated February 5
roadway reduced to one lane, single line traffic - alternating directions on New Hampshire 111 in both directions from Wyman Street to MP 17.883 because of construction work — starting 7:00 PM, 02/10/10 until Thursday, at about 6:00 AM last updated February 5
roadway reduced to one lane, single line traffic - alternating directions on New Hampshire 111 between Wyman Street and I-93 because of construction work — starting 7:00 PM, 02/11/10 until Friday, at about 6:00 AM last updated February 5
road closed intermittently on New Hampshire 125 in both directions at NH 16 because of construction work — starting 8:00 AM, 02/16/10 until February 16 last updated February 5
road closed intermittently on New Hampshire 125 in both directions at Anctil Court because of construction work — starting 8:00 AM, 02/18/10 until February 18 last updated February 5
roadway reduced to three lanes on Interstate 95 in both directions at Exit 2: NH 101 due to long term road construction work — last updated February 6
bridge construction, long term road construction on Interstate 93 in both directions between Exit 3: NH 111 and Lowell Road — until June 25 last updated October 29
long term road construction on New Hampshire 102 at NH 28 — until August 13 last updated October 29
single line traffic - alternating directions, temporary traffic lights on New Hampshire 28 in both directions at NH 28BYP; Island Pond because emergency repairs are in progress — last updated October 29
long term road construction, bridge construction on Interstate 95 in both directions at Exit 6 — until August 27 last updated November 24
long term road construction on Interstate 93 northbound from Brookdale Road to Exit 3: NH 111 — until June 29, 2012 last updated October 29
road construction, bridge construction, road closed intermittently on New Hampshire 3A in both directions at Brown Avenue — until June 25 last updated December 17
bridge maintenance operations on unknown road at 42.901N, 72.513W — last updated November 9
bridge construction on Everett Turnpike in both directions from Exit 11 to Exit 12 — until June 24, 2011 last updated October 29
 
 Construction & Maintenance Activities   Text Only |  View All Incidents
Construction & Maintenance Activities
NEW HAMPSHIRE
Construction and Maintenance Activities - Interstate 93
Interstate 93 northbound: from Brookdale Road to Exit 3: NH 111
long term road construction — until June 29, 2012
Comment: This project, in the Town of Windham, involves the construction ot the new Northbound barrel from the Salem Town Line to just north of the NH Rte 111 crossing of I-93.

last updated October 29
 
Construction and Maintenance Activities - Interstate 93
Interstate 93 in both directions: between Exit 3: NH 111 and Lowell Road
bridge construction, long term road construction — until June 25
Comment: This project, in the Town of Windham, involves the construction of a new I-93 Southbound off ramp at Exit 3. Also, there will be construction of the I-93 Northbound bridges over NH Route 111 and Route 111A on a new alignment.

last updated October 29
 
Construction and Maintenance Activities - Interstate 93
Interstate 93 in both directions: between Industrial Park Road and Exit 42: US 302
roadway reduced to one lane, width limit in effect because of road maintenance activities — until February 16
Comment: Audio Text: Industrial Park Road in Littleton will be reduce to one lane under I-93 with a sixteen foot width restriction for pier and abutment repair.

last updated December 22
 
Construction and Maintenance Activities - Interstate 95
Interstate 95 in both directions: at Exit 2: NH 101
roadway reduced to three lanes due to long term road construction work from 06:00am to 06:00pm on weekdays —
Comment: Audio Text: Construction for Open Road Tolling on Median Side approaching Hampton Toll Plaza.. Traffic may Backup @ toll plaza during high volume traffic.. Construction for Open Road Tolling on Median Side approaching Hampton Toll Plaza.. Traffic may Backup @ toll plaza during high volume traffic..

last updated February 6
 
Construction and Maintenance Activities - Interstate 95
Interstate 95 in both directions: at Exit 6
long term road construction, bridge construction — until August 27
Comment: This project takes place in Portsmouth, beginning at the Spaulding Turnpike overpass, and proceeding North for 1.07 miles to the Piscataqua River Bridge. The project involves road and bridge rehabilitation.

last updated November 24
 
Construction and Maintenance Activities - New Hampshire 1A
New Hampshire 1A in both directions: between Eisenower Street and Hampton Beach State Park Road
roadway reduced to one lane, width limit in effect, sidewalk closed due to bridge construction work — until July 17, 2011
Comment: This project consists of the rehabilitation of the bridge that carries NH Route 1A over the Hampton River in Hampton and Seabrook. There is currently a 10 foot width restriction on the Hampton River Bridge. Wide loads greater than 10 ft in width must take an alternate route. A signed route via Rte.286, Rte 1 and Rte 101 is in place for guidance.

last updated December 10
 
Construction and Maintenance Activities - New Hampshire 3A
New Hampshire 3A in both directions: at Brown Avenue
road construction, bridge construction, road closed intermittently — until June 25
Comment: This project constructs a portion of the overall roadway and bridge improvements along the new Manchester Airport Access Road. The improvements consist of the construction of a bridge to carry Manchester Airport Access Road over the Merrimack River, B&M Railroad and NH Route 3A at the Bedford-Manchester town/city line. NH Rte 3A will also be reconstructed just to the south of the Brown Ave. and Hazelton Ave. intersection.

last updated December 17
 
Construction and Maintenance Activities - New Hampshire 12
New Hampshire 12: at Vilas Bridge
road closed because of bridge maintenance work —
Comment: In Walpole, The Vilas Bridge, From NH-12/NH-123 across the Ct. River is closed for Bridge repair work. The Church st Bridge will serve as the detour accross the River

last updated April 2
 
Construction and Maintenance Activities - New Hampshire 16
New Hampshire 16: at NH 125
bridge construction, major road construction — until October 15
Comment: This project involves the reconstruction and widening of the northbound barrel of the Spaulding Turnpike in Rochester, beginning south of the Exit 11 NB Off Ramp continuing northerly for approximately 1.5 miles, through the Exit 12 interchange. It includes the pavement rehabilitation along the Exit 11 NB Off Ramp and realignment and reconstruction of the Exit 12 NB On and Off ramps. Approximately 3,400 feet of NH Route 125 will also be widened and reconstructed to tie into the new ramps location.

last updated April 30
 
Construction and Maintenance Activities - New Hampshire 16
New Hampshire 16: at US 202; Spaulding Turnpike
major road construction — until October 14, 2011
Comment: This project involves the reconstruction and widening of the northbound and southbound barrels of the Spaulding Turnpike in the Exit 13 area of Rochester. Construction starts 1300 feet south of the bridge over Axe Handle Brook and continues north for 1.84 miles, ending at the bridge over NH Route 202A. Approximately 2850 feet of Route 202 will be widened and reconstructed to accomodate six lanes.

last updated November 19
 
Construction and Maintenance Activities - New Hampshire 16
New Hampshire 16: from US 202; Chestnut Hill Connector to Cross Road
long term road construction — until October 5, 2012
Comment: This project involves the reconstruction and widening of the northbound and southbound barrels of the Spaulding Turnpike beginning south of the Exit 15 NB Off-ramp and continues north 1.08 miles to the Exit 16 NB Off-ramp.

last updated September 10
 
Construction and Maintenance Activities - New Hampshire 28
New Hampshire 28 in both directions: at NH 28BYP; Island Pond
single line traffic - alternating directions, temporary traffic lights because emergency repairs are in progress —
Comment: Single Lane Traffic, Alternating Directions on Island Pond Road Between North Shore Road & Taryn Road in Town of East Derry.. Drive with Caution..

last updated October 29
 
Construction and Maintenance Activities - New Hampshire 102
New Hampshire 102: at NH 28
long term road construction — until August 13
Comment: This project is in Derry and consists of the reconstruction of the Route 102 and Route 28 intersection to improve capacity and function.

last updated October 29
 
Construction and Maintenance Activities - New Hampshire 111
New Hampshire 111 in both directions: from MP 17.286 to MP 17.754
roadway reduced to one lane, single line traffic - alternating directions because of construction work — starting 7:00 PM, 02/09/10 until Wednesday, at about 6:00 AM

last updated February 5
 
Construction and Maintenance Activities - New Hampshire 111
New Hampshire 111 in both directions: from Wyman Street to MP 17.883
roadway reduced to one lane, single line traffic - alternating directions because of construction work — starting 7:00 PM, 02/10/10 until Thursday, at about 6:00 AM

last updated February 5
 
Construction and Maintenance Activities - New Hampshire 111
New Hampshire 111: between Wyman Street and I-93
roadway reduced to one lane, single line traffic - alternating directions because of construction work — starting 7:00 PM, 02/11/10 until Friday, at about 6:00 AM

last updated February 5
 
Construction and Maintenance Activities - New Hampshire 125
New Hampshire 125 in both directions: at Anctil Court
road closed intermittently because of construction work — starting 8:00 AM, 02/18/10 until February 18

last updated February 5
 
Construction and Maintenance Activities - New Hampshire 125
New Hampshire 125 in both directions: from NH 16 to NH 16
road closed intermittently because of construction work — starting 8:00 AM, 02/17/10 until February 17

last updated February 5
 
Construction and Maintenance Activities - New Hampshire 125
New Hampshire 125 in both directions: at NH 16
road closed intermittently because of construction work — starting 8:00 AM, 02/16/10 until February 16

last updated February 5
 
Construction and Maintenance Activities
Everett Turnpike in both directions: from Exit 11 to Exit 12
bridge construction — until June 24, 2011
Comment: This project consists of bridge rehabilitation and widening and safety improvements to the Merrill's Marauders bridge over the Souhegan River in Merrimack. Expect occasional lane closures between 9 AM and 3 PM. In the towns of Nashua and Merrimack.

last updated October 29
 
UNKNOWN
Construction and Maintenance Activities
Unknown road in unknown direction: at unknown point bridge maintenance operations —
Comment: Audio Text: In Chesterfield on Brook Street, bridge repairs are scheduled to start November 16th 2009 until May 16th 2010. Single lane traffic will be in effect throughout the time work is being performed. In Chesterfield on Brook Street, bridge repairs are scheduled to start November 16th 2009 until May 16th 2010. Single lane traffic will be in effect throughout the time work is being performed.

last updated November 9



New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

  NH.gov | privacy policy | accessibility policy    copyright 2009. State of New Hampshire